AI for Construction Lawyers: Change Orders and Delay
By Lucerna LawPublished 10 min readUpdated
AI for construction lawyers is a way to read a project's paper against its contract. It finds the notice clause and the letters that may satisfy it, follows a change order from RFI to pay application, and pulls weather and crew counts out of daily logs. Delay analysis and entitlement stay with counsel and the scheduling expert.
Which construction project records can AI read, and which stay closed to it?
AI can read the construction records that are text: the contract and its general conditions, change orders, RFIs and responses, daily logs, meeting minutes, letters, email and pay applications saved as text PDFs. Drawings, photographs and native schedule files are closed to a tool that reads text.
A project may produce many kinds of record, in many formats. Sorting them comes before uploading anything.
| Record | Form it may arrive in | Readable as text? |
|---|---|---|
| Contract, general and supplementary conditions | PDF or Word | Yes. A scan only in a PDF of up to 1,000 pages, unchecked |
| Change orders and change order requests | PDF forms, some signed and scanned | Yes. Scanned ones only in a PDF of up to 1,000 pages, unchecked |
| RFIs and responses | PDF export from project software | Yes |
| Daily logs | PDF export, or handwritten sheets | Exports yes. Handwriting needs a person's eyes |
| Schedules and updates | Native scheduling files, or PDF printouts | Printouts in part |
| Pay applications | PDF or spreadsheet | PDF yes, spreadsheet no |
| Drawings and photographs | Images | No |
| Project email | Mailbox files or single messages | Single messages |
Lucerna Law accepts PDF, Word (.docx), .eml email, and text, CSV or XML exports. A change order that was signed, scanned and filed is read from its image if its PDF has 1,000 pages or fewer, with no text in the file to check the reading against. In a longer PDF it is stored but gives the model nothing. Spreadsheet workbooks and native scheduling files are not among the file types it accepts.
Email needs a second look on a construction file. Lucerna Law reads one .eml file as one message and does not read attachments. It counts them and names them on the file's page. A transmittal email whose whole point is the attached change order request therefore has to be followed by the attachment, uploaded as its own file.
Notice provisions: the clause construction lawyers read first
Notice provisions are where construction lawyers begin, because a contract may tie the right to more money or more time to a written notice given within a stated number of days. The reading job is to find each such clause, then find the letter or email that may satisfy it.
Private contracts state their own terms, and this post quotes no private form. The federal construction clauses are public and show how exact a notice term can be. They apply to federal contracts that include them. They are an illustration here, not a statement of what any private contract says.
The same clause carries two time limits. Under paragraph (d), except for an adjustment based on defective specifications, no adjustment for a change under paragraph (b) is made for costs incurred more than 20 days before the contractor gives the written notice. Under paragraph (e), the contractor must assert its right to an adjustment within 30 days after receiving a written change order or furnishing the paragraph (b) notice, by a written statement describing the general nature and amount of the proposal, unless the Government extends the period. The regulation's own introduction says the 30-day period may be varied according to agency procedures.
Two neighbouring clauses work the same way.
- The Differing Site Conditions clause, 52.236-2, says the contractor shall "promptly, and before the conditions are disturbed, give a written notice" to the Contracting Officer of the conditions it describes. Paragraph (c) says no request for an equitable adjustment under the clause is allowed unless that notice was given, though the Contracting Officer may extend the time for giving it.
- The Default clause for fixed-price construction, 52.249-10, says in paragraph (b) that the contractor's right to proceed is not terminated, and the contractor is not charged with damages under the clause, if the delay arises from unforeseeable causes beyond the contractor's control and without its fault or negligence, and the contractor, "within 10 days from the beginning of any delay (unless extended by the Contracting Officer), notifies the Contracting Officer in writing of the causes of delay."
Set side by side, the three federal clauses read as follows. Each row keeps the qualifier the clause attaches to its notice term, and the clauses apply to federal contracts that include them.
| Federal clause | What its text says about notice | Qualifier in the text |
|---|---|---|
| Changes, 52.243-4(d) | For a change under paragraph (b), no adjustment for costs incurred more than 20 days before the contractor gives the written notice | Except for an adjustment based on defective specifications |
| Changes, 52.243-4(e) | Assert the right to an adjustment within 30 days after receiving a written change order or furnishing the paragraph (b) notice | Unless the Government extends the period. The regulation's own introduction says the 30-day period may be varied according to agency procedures |
| Differing Site Conditions, 52.236-2 | Written notice "promptly, and before the conditions are disturbed" | The Contracting Officer may extend the time for giving it |
| Default, 52.249-10(b) | Written notice of the causes of delay "within 10 days from the beginning of any delay" | Unless extended by the Contracting Officer |
How strictly a court or board enforces a notice term is a question of the governing law and the forum. Nothing in this post answers it.
Ask the file
List every clause in the contract and general conditions that requires written notice. For each, give who must give it, to whom, within how many days, and of what event.
A worked construction delay claim: rock, an RFI and ninety-one days
A construction delay claim can be laid out as a sequence of five readings, each matching an event on site to a piece of paper. Take a hypothetical excavation subcontractor on a private office building that hits rock where the geotechnical report showed soil, and finishes 91 days late.
The file holds the subcontract with its general conditions, the geotechnical report, 60 RFIs, 22 change order requests, eleven months of daily logs, monthly schedule updates printed to PDF, fourteen pay applications and about 900 emails. The general contractor has withheld liquidated damages. The subcontractor says the rock caused the delay and that it said so at the time.
- Find the first sign of rock. Ask for the earliest daily log entry, RFI or email that mentions rock, refusal or a change in excavation method, with its date and author.
- Find the first written notice. Ask which letters and emails from the subcontractor to the general contractor mention rock, and what each one asks for.
- Count the days between them. The tool gives two dated passages. Count the days yourself, by the contract's own method of counting.
- Read the response. Ask what the general contractor and the engineer said in reply to RFI 47, and whether anyone directed the subcontractor to proceed.
- Follow the money. Ask which change order requests price the rock, what became of each, and which pay application first bills any of it.
Ask the file
What is the earliest document in this matter that mentions rock at the east footings? Quote it and give its date and author.
Which messages from the subcontractor between March and May say the rock will affect the schedule or the price? Quote the sentence that says so in each.
That is why the message exports matter. Lucerna Law reads Android SMS backups, WhatsApp chat exports and message productions as CSV, and it cites each message singly. A chronology that joins those messages to the project email is the subject of the post on building a case chronology from emails.
How do construction lawyers trace a change order through the file?
Construction lawyers trace a change order by following one item of changed work through every document that mentions it, from the question that raised it to the payment line that billed it. Each document may be written by a different person for a different purpose, and the numbers can drift.
| Stage | Document | What to ask of it |
|---|---|---|
| The question | RFI and response | What was asked, what was answered, and when? |
| The direction | Field order, email or meeting minute | Who told whom to proceed, and on what terms? |
| The price | Change order request and backup | What amount and how many days were requested? |
| The agreement | Executed change order | What amount and time were granted, and what was reserved? |
| The payment | Pay application | Which line bills it, and in which month? |
The fourth row holds the sentence that matters most in a later dispute. An executed change order may state that it is full compensation for the change, including delay, or it may reserve time for later. Ask for that sentence to be quoted from every change order in the file.
Ask the file
For each executed change order, quote any sentence that says it is full and final, that waives further claims, or that reserves time or money for later.
Which change order requests have no executed change order in the file, and what is the last document that mentions each one?
Do not ask a reading tool to total a schedule of values or reconcile retainage. It can report where each figure appears. The addition belongs in a spreadsheet, checked by a person. How a signed contract is read once it has become evidence is covered in the post on AI contract review, under reading a signed contract in a dispute.
Daily logs and schedules in a construction dispute
Daily logs in a construction dispute answer questions about what happened on a given day, and a reading tool can collect those answers across months. Schedules are different. A printed schedule update may give activity names and dates as text, while the logic that links them may not be on the page.
Daily logs repay narrow questions.
- Which days record no work, and what reason does each entry give?
- What crew size and equipment does each entry record for the excavation trade?
- Which entries mention waiting for an answer, an inspection or another trade?
- What weather does each entry record, and on which days does it say work stopped for it?
Ask for a quotation every time. Log entries can be short and abbreviated, and a paraphrase can turn "no work, rain a.m." into a full lost day.
A schedule printed to PDF can answer a simpler question than the one a delay expert asks. It can show what finish date each monthly update gave for an activity, and in which update that date first moved. It cannot show why. Where the printout leaves out the links between activities and the float, the tool sees neither.
Ask the file
In each monthly schedule update, what finish date is shown for foundation excavation? List the updates in order and say in which one the date first changed.
Where should construction lawyers not rely on AI on a claim?
Construction lawyers should not rely on AI for delay analysis, for entitlement, for arithmetic, or for a statement that no notice exists. Each depends on something a reading tool lacks: schedule logic, the governing law, a calculator, or sight of the whole file at once.
- Critical path and concurrency. Which delay drove the completion date is an expert's analysis of schedule logic. Printed bars and dates alone do not contain it.
- Entitlement. Whether a notice was timely, waived or excused is a matter of the contract and the law that governs it.
- Sums. Change order logs and pay applications should be totalled outside the tool.
- "No notice was given." Lucerna Law sends a matter of up to about 150 single-spaced pages to the model whole. From a larger matter the model gets the passages that best match the question. A file with eleven months of logs and 900 emails is likely far past that size, so an answer that nothing was found means nothing was found among the passages selected.
- Drawings. A dispute about what sheet S-201 showed needs the sheet and an engineer.
- Anything scanned. A scanned page is read with no text in the file to check it against, and in a PDF of more than 1,000 pages it is not read. Handwritten logs need a person's eyes.
Each citation is checked by the server only to confirm that it names a passage the model was given. Lucerna Law's homepage says plainly that the check does not test whether the passage supports the statement, and its product section describes a statement of facts as an answer in the chat, for the lawyer to check and edit. Its pages describe no scheduling analysis and no connection to project management software.
Projects end and buildings fill with tenants. The disputes that follow run on leases, notices and repair requests, which is the file described in AI for landlord-tenant attorneys.
This post describes a way of working with a project file. It is not legal advice, and notice, lien and payment rules differ by contract and by jurisdiction.